Glasgow

Easterhouse grid connection

Not disclosed
Grid queue onlyNeeds corroboration500 MWVery large
Where it standsNeeds corroboration
  1. Grid queue only
  2. Proposal notice
  3. Application
  4. Decision
  5. Built

Only a grid connection application exists. No project has been announced and nothing is in planning.

Have your say · council applicationNothing in planning yet.How to have your say
Size500 MWVery large13% of Scotland's winter peak demand
SurroundingsNot assessed: no application site to measure from yet.
Public responseNo public comments published yet.
How the flags work

Red: nearest building within 100 m, 10% or more of the site in a flood zone, or a designation overlapping the site. Amber: building within 500 m, any flood-zone overlap, or a designation within 500 m. Green: none of these. Measured from the council's application site; buildings from OpenStreetMap, flood zones from SEPA, designations from NatureScot and Historic Environment Scotland.

Overview

Gate 2 grid application. NESO does not name individual sites.

Planning

This is a grid connection application only. There is no planning activity on the council portal.

Site location: no planning application yet, so there is no application site to map. The position shown is approximate.
Council Glasgow City Council: no data centre application at Easterhouse. Searched 18 Oct 2026.

Search the Glasgow planning portal for the latest documents, consultee responses and public comments.

Sources

Context only, not counted as corroboration: