Argyll and Bute

Killellan, Dunoon

Argyll Data DevelopmentArgyll Data Development & SambaNova
Stalled6 sources600 MWVery large
Where it stands6 independent sources
  1. Announced
  2. Stalled
  3. Application
  4. Decision
  5. Built

Reported as stalled. There is no live planning application.

Have your say · council applicationNo open comment period.How to have your say
Size600 MWVery large15% of Scotland's winter peak demand
SurroundingsNot assessed: no council site location to measure from.
Public responseNo public comments published yet.
How the flags work

Red: nearest building within 100 m, 10% or more of the site in a flood zone, or a designation overlapping the site. Amber: building within 500 m, any flood-zone overlap, or a designation within 500 m. Green: none of these. Measured from the council's application site; buildings from OpenStreetMap, flood zones from SEPA, designations from NatureScot and Historic Environment Scotland.

Overview

184-acre campus pitched at 100–600MW in stage one, aspiring to 2GW. £15m initial raise in late 2025.

Sources disagree: The stall is reported by APRS (citing The Herald, Aug 2026) and Resultsense; the developer has not confirmed it.

The developer's case

We have not found a project website or public statement from the developer beyond what is listed below.

Jobs in context

Permanent jobs claimedNone published
At the 1.6 per MW study averageabout 960for 600 MW
Industry modeltechUK, based on older, smaller sites8.5
Planned UK sitesVerdant study of 20 schemes, 20261.6
QTS Cambois, Northumberland720 MW, about 400 jobs0.56

Permanent jobs per megawatt of capacity.

Construction jobs are real but temporary. Figures for "job-years", "jobs supported" or "indirect" jobs count work elsewhere in the economy, not people on site. The per-MW measure comes from the think tank Verdant; techUK says it misses jobs supported outside the site, and the UK Government calls it misleading. The Next Web Resultsense

Site and design

LandKillellan Farm, Toward

Items marked Claim are the developer's own figures, not independently checked.

The objectors' case

No organised objection or formal objections found yet. Know of a campaign group? Use Report incorrect data at the top of the page.

Planning

This scheme is reported as stalled. The council records below are the only consents found.

Site location: no site boundary is published on the council's planning map for this application. The position shown is approximate.
Council planning record · Argyll and Bute Council
ReferenceTypeStatusDateApplicant
20/00229/PPBuilding for data storage purposesApplication Approved15 May 2020
25/00445/CLAWULawful start of the 2020 permissionApplication Approved28 Mar 2025

Search the Argyll and Bute planning portal for the latest documents, consultee responses and public comments.

Sources