Angus

Edzell grid connection

Not disclosed
Grid queue onlyNeeds corroboration800 MWVery large
Where it standsNeeds corroboration
  1. Grid queue only
  2. Proposal notice
  3. Application
  4. Decision
  5. Built

Only a grid connection application exists. No project has been announced and nothing is in planning.

Have your say · council applicationNothing in planning yet.How to have your say
Size800 MWVery large20% of Scotland's winter peak demand
SurroundingsNot assessed: no application site to measure from yet.
Public responseNo public comments published yet.
How the flags work

Red: nearest building within 100 m, 10% or more of the site in a flood zone, or a designation overlapping the site. Amber: building within 500 m, any flood-zone overlap, or a designation within 500 m. Green: none of these. Measured from the council's application site; buildings from OpenStreetMap, flood zones from SEPA, designations from NatureScot and Historic Environment Scotland.

Overview

Gate 2 grid application to the new Brechin substation. NESO confirms 28 data centres totalling 8.86GW are seeking connection in Scotland but does not name sites.

Planning

This is a grid connection application only. There is no planning activity on the council portal.

Site location: no planning application yet, so there is no application site to map. The position shown is approximate.
Council Angus Council: no data centre application near Edzell or Brechin. Searched 18 Oct 2026.

Search the Angus planning portal for the latest documents, consultee responses and public comments.

Sources

Context only, not counted as corroboration: